Working with Artichoke, CCS were commissioned to Engineer a range of structures for the bi-annual Lumiere Festival in Durham. Supporting bespoke fabrications from existing buildings required careful consideration, taking into account both the framing of the new constructions, and their interface with the General Public.
Assessment of Grade 1 listed arch bridge was also undertaken to facilitate “Elephantastic”, with the cable-stay Solar Flare Globe a particular highlight.