Manchester Central Convention Complex

Project:
Manchester Central Convention Complex
Location:
Manchester
Description:
Design and installation of bespoke house “mother grid”, for use within existing converted grade 2 listed former train shed hall.
Full principal inspection report completed on structure (2011) with repairs schedule.
Strengthening works undertake (Autumn 2011) to 3 number arches to increased load-carrying capacity for events management.

Client:
Manchester Central
Value:
£150k
Dates:
2011- present